Ken,
The AT&T (Crown Castle) cellular building next to the SBARC Comm Shelter was totally crushed and removed. It was replaced by a Cell On Wheels (COW) positioned between the Italian Stone Pine tree and the reservoir. 100% of the cellular equipment including the tower was all removed. The COW is powered by power from the City load center and standby generator. A Telco cable from the City Comm bldg breakout panel was run to the COW plus a fiber optic cable near the road.
On Friday 17 May 2024 all work was completed. The COW is fully installed. Hopefully they will keep the potti there. There has never been one there.
Bill